The project includes piping of sewage network with 200mm and 315mm Poly Ethylene pipes for approximately 24000m along with related fittings and construction of 700 concrete manholes with 1 to 5m height as onsite concrete work, due to high water level and landslip in the area, special skills were needed and made the operation difficult.
Projects > LAHIJAN SEWAGE COLLECTION SYSTEM- ZONE 5
View the embedded image gallery online at:
https://chakad.co/en/projects/chakad-projects/complete-projects/item/71-lahijan-sewage-collection-system-zone-5.html#sigProId5fb7fffbef
https://chakad.co/en/projects/chakad-projects/complete-projects/item/71-lahijan-sewage-collection-system-zone-5.html#sigProId5fb7fffbef
SPECIFICATION
- Employer: Guilan Rural Water and Wastewater Co.
- Location: Guilan
- Start Date: April 2001
- Finish Date: May 2004