Project consists of implementation of water distribution network, Lisar section, with 40 to 225 mm diameter poly ethylene pipes for about 89 km together with valve chambers, valve installations and other related operations. Also construction and finishing Lisar and Ghale Dush pumping station, pumping control system and related electrical and mechanical utilities are other parts of the project.
Projects > Construction of Water Distribution Network and Pump Stations for Section 8 of Guilan West Zone
SPECIFICATION
- Employer: Guilan Rural Water and Wastewater Co.
- Location: Guilan
- Start Date: April 2001
- Finish Date: May 2004