Projects > Water pipeline from Baghan Dam

The project includes the following activities:

Construction of Spiral steel pipe with a diameter of 600 mm and a thickness of 6.3 mm, this pipe is used from the beginning of the route to the anarestan branch of 17300 meters in length.

Construction of Spiral steel pipe with a diameter of 450 mm and a thickness of 5.5 mm from anarestan branch to jamalabad tanks with a length of 10,000 meter.

Pumping station 1: This station has 1+4 pumps of high pressure type with the power of 102 kW, due to its proximity to the dam and lack of adequate space, it is connected directly to the lake of dam(Four main pumps and one reserve pump).

Pumping station 2: This station has 4 + 1 pumps of high pressure type and each pump with a power of 315 kW (Four main pumps and one reserve pump).

In total, the pipeline has crossed a 56-inch gas pipeline, which has a gas company with a width of 20 meters and the pipeline should be built at a distance of 15 meters from the gas pipeline.

The pipeline has a length of about 27.3 km.

The construction of two 5000 cubic meter of water storage at the site of the pumping station 2 and the city of Anarestan.

Preparation of materials and implementation of pipeline cathodic protection system.

Construction of all valve chambers of pipe line

Carrying out piping jaking and building a metal truss bridge for pipe crossings.

SPECIFICATION

  • Employer: Boushehr Regional Water Co.
  • Location: Boushehr - anarestan
  • Start Date: 5 november 2018
  • Finish Date: 1 march 2021