The project includes the following activities:
Construction of a secondary pump station building with a capacity of about 250 liters per second, along with a transmission line of 1800 meters in length.
Polyethylene pipe PE100 of 200-450 mm in size.
Construction of the valve chambers on grade 3 pipelines by installing all equipment and associated valves.
excavating and embedding of pipes with technical and mechanical equipment.
Installation of Risers, automatic valves , and other irrigation equipment.