Mentioned project consists of performing Zabol- Zahedan civil and mechanical operations and building pumping station's pipeline fittings. Operation area is located in pumping station No.1, 2, 3, and 4 of water carrying project from Zabol half-well to Zahedan alongside of the main road.
Projects > Construction and Installation of Zabol-Zahedan Water Transmission Pipeline
View the embedded image gallery online at:
https://chakad.co/en/projects/chakad-projects/complete-projects/item/82-construction-and-installation-of-zabol-zahedan-water-transmission-pipeline.html#sigProIdc6d274ff5e
https://chakad.co/en/projects/chakad-projects/complete-projects/item/82-construction-and-installation-of-zabol-zahedan-water-transmission-pipeline.html#sigProIdc6d274ff5e
SPECIFICATION
- Employer: Sistan Regional Water Co.
- Location: Zahedan
- Start Date: 15/01/2002
- Finish Date: 30/04/2002