Projects > Increasing Capacity of Oil production's transmission line from Tabriz to Miyandoaab with EPC method

The mentioned project is defined to increase capacity of oil production transmission line from Tabriz to Miyandoaab. After preliminary examination and studies, planning, purchasing, installation and execution of electric pump station in Tabriz, the new send/receive utility in Tabriz pump station and Miyandoaab terminal, distribution and metering utilities in Miyandoaab and Maraghe, along with implementation of about 160 km Tabriz- miandoaab 14'' pipeline with capacity of 55,000 barrel per day was assigned to this joint venture.

SPECIFICATION

  • Employer: National Engineering and oil construction Co.
  • Location: Azarbayjan sharghi
  • Start Date: June 2005
  • Finish Date: 05/09/2011