The project was to establish 6 km pipeline with 1250 diameter pipes which are made of cement and must cross over the Sefid Roud River by steel pipes.
Projects > Sangar Water Supply Pipelines
View the embedded image gallery online at:
https://chakad.co/en/projects/chakad-projects/complete-projects/item/77-sangar-water-supply-pipelines.html#sigProId5b79ab870c
https://chakad.co/en/projects/chakad-projects/complete-projects/item/77-sangar-water-supply-pipelines.html#sigProId5b79ab870c
SPECIFICATION
- Employer: Guilan water and waste water company
- Location: Guilan
- Start Date: 17/11/1999
- Finish Date: 16/05/2002