Pazanan gas gathering and injection project was defined to use and increase Pazanan's oil-well pressure and to prevent the loss of mentioned well's gas. The project consists of the following points:
- Gathering sour gas with high pressure (two phase) from eleven scattered gas-well in Pazanan mountain and impracticable area by 30 km underground 8" and 10 " pipes.
- Gas transmission by a 20" pipe, with a length of 15 km to the liquid gas separation area.
- Accumulating light gas in compression station.
- Transmitting accumulated gas from compression station by a 20" pipeline with 0/875" thickness and 15 km length. Injecting in six injecting well in Pazanan by 6" pipeline.
- Installing foundations on top of the well for injection and along with all pipeline security Factors. Establishing 40 km air-network of 11000 volt electricity transmission.