Projects > First part RMC canal of irrigation an draining network for southern Ghasr-e-Shirin lands

This project is defined for irrigation and draining of southern Ghasr-e-Shirin's lands and farms which the required water is being supplied from Zagros reservoir Dam. The executive operation includes about 30 km RMC water transmission canal. Executive activities are as follow:

  •  Piping, using steel pipes with 1800, 1700,200mm diameter for the total amount of 1700 meters.
  •  Establishing chambers, transporting and installing valves • Steel works for the total of 600.000 kg
  •  Prefabricated and in place Pouring of Concrete for the total of 25.000 cubic meters and also construction of structures and platforms.

SPECIFICATION

  • Employer: Kermanshah Regional Water Co.
  • Location: Kermanshah
  • Start Date: 06/11/2006
  • Finish Date: 17/02/2012