Mentioned project consists of canal excavation, sand blast and pipe's hot isolation, pipe installation along with establishing required cathodic protection systems. Also, establishing a C.G.S pressure reducer system with capacity of 50,000 cubic meters per hour is on contractor's responsibility. Operation location is around Firuzkouh industrial city.
Projects > Firouzkouh-Damavand 16'' transmission line (Zone 1)
View the embedded image gallery online at:
https://chakad.co/en/projects/chakad-projects/complete-projects/item/65-firouzkouh-damavand-16-transmission-line-zone-1.html#sigProId5a82b2cde5
https://chakad.co/en/projects/chakad-projects/complete-projects/item/65-firouzkouh-damavand-16-transmission-line-zone-1.html#sigProId5a82b2cde5
SPECIFICATION
- Employer: Iran National Gas Co.
- Location: Tehran
- Start Date: 19/12/2003
- Finish Date: 18/06/2005